Time: September 2018
Applicator: Lafarge Zementwerke
Place: Vienna, Austria

Notice: Trying to get property 'name' of non-object in /home/customer/www/overmat-screed.com/public_html/wp-content/themes/overmat/sections/news/thumbnail-intro.php on line 15

Overmat has a good collaborative relationship with the Lafarge group, supplying customised equipment for use on its projects.
Together we developed a bespoke Overmat system for lightweight subfloors, which helps Lafarge with the installation of its specialist insulation product, Airium.

In September 2018 it was used on a residential project in Vienna, Austria, to insulate six apartments.

In less than eight hours, 45m³ of material was produced and applied to insulate a floor area of 400m², with no wasted material.
The Overmat system was in constant action from the beginning to the end of the job, guaranteeing a homogeneous, high-quality product.

The final result is a flawless finish and a satisfied client.

Legal Headquarters
via Campardone, 7 Z.I.
31014 Colle Umberto (TV)
Italia
Operational Headquarters
Via Vittorio Veneto, 20
31014 Colle Umberto (TV)
Italia
Phone
+39 0438 434443